Cosby

A warm-deck flat roof in Cosby, over a kitchen extension and bay window

The rubber roof on this kitchen extension had been glued straight onto the old felt, and the bay window's felt roof was failing. We stripped both roofs back to the joists, laid a new 18 mm OSB deck, and built a warm-deck system on top — foil-lined vapour control layer, 150 mm of torch-on insulation and three layers of bitumen felt — with new edge trims, fascia and guttering, in four days.

The finished extension roof from the scaffold: grey mineral-surfaced felt laid in neat overlapping sheets between the red brick wall and the tiled roof slope, with a new white fascia and black gutter along the front edge and the bay window roof below.
Location
Cosby
Completed
August 2024
Workmanship guarantee
20 years (at time of works)
Work
Flat Roofing

How it went

From the first scaffold board to the finished roof.

The kitchen extension's old black rubber roof before work, dull and scuffed with footprints and debris, running from the red brick wall and tiled roof slope down to a worn front edge.The extension roof mid-job, stripped back between the brick wall and the tiled roof slope, with pale fibre-faced sheets laid in strips and black bitumen sealing their joints and edges.Close view of the finished felt on both roofs: the extension's grey mineral cap sheet meeting a new black gutter and white fascia, with the newly felted bay window roof stepping down below.The finished extension roof from the scaffold: grey mineral-surfaced felt laid in neat overlapping sheets between the red brick wall and the tiled roof slope, with a new white fascia and black gutter along the front edge and the bay window roof below.
Before01 / 04

Rubber glued over old felt

The rubber roof on this kitchen extension had been put on badly from the start. The previous contractor had glued the rubber membrane straight onto the old felt roof underneath, rather than taking it back to a sound deck — so whatever was wrong with the felt stayed wrong, just hidden. The bay window next to it had a felt roof of its own that was failing.

What we found

We'd planned for it from the quote: both roofs, both failed coverings and the old timber deck were coming off. Starting from the joists is the only way to know what you're building on, and it meant the extension and the bay could be done properly together rather than patched one at a time.

What we did

  • Put up scaffolding — even on a smaller job like this, it's the safe way to work.
  • Stripped the roof coverings and the old deck, into a licensed skip on site.
  • Laid a new deck in 18 mm OSB board.
  • Fitted a foil-lined vapour control layer over the deck.
  • Laid 150 mm of torch-on insulation board, which is made to take a gas torch on its surface, so the felt can be bonded straight onto it.
  • Finished with a three-layer bitumen felt system.
  • Fitted new perimeter edge trims, fascia and guttering.
  • Sealed every abutment — to the house brickwork and to the adjoining pitched roof — so the joins are as watertight as the roof itself.

The whole job took four days.

Why a warm deck over a kitchen

A kitchen puts a lot of warm, damp air into the space under its roof. On a cold-deck roof, where the insulation sits below the timber, that moisture can reach the cold deck and condense — which is how decks rot from the inside. A warm deck puts the vapour control layer and the insulation above the timber instead, so the deck stays on the warm side and the moist air never reaches a cold surface.

How it turned out

Two roofs, one system, and a 20-year workmanship guarantee on the work, written into the quote. Nothing unusual happened on this one — and that's the point. Most flat roofs we renew look like this: a tired extension or bay that someone else covered quickly, taken back to the deck and done properly.

If your extension roof is due, get in touch, or read more about our flat roofing.

What we used

  • 18 mm OSB timber deck
  • Foil-lined vapour control layer
  • 150 mm torch-on insulation board (warm deck)
  • Three-layer bitumen felt system
  • New perimeter edge trims, fascia and guttering

The work on this job